Important Notice

Wednesday, March 26, 2025

We wish to inform you of an important decision regarding the Dome Louis-Riel of our school.

After a thorough evaluation of the damage caused by the snowstorm last February, we regret to announce that the Dome will not be reopened for the 2024-2025 school year.

That being said, the CEPEO has planned a complete replacement of the dome’s canvas this summer with a scheduled reopening in September 2025.

Cleaning work to prepare the site is currently underway. The shell change will be carried out as planned.

Thank you for your understanding and collaboration.

Sincerely,

 

Carole Séguin                                               Sophie Anderson
Director                                                          Dôme LR Manager

 ——————————————————————————————–

18 février 2025

Objet: Fermeture du Dôme Louis-Riel

Nous tenons à vous informer que le Dôme Louis-Riel sera fermé jusqu’à nouvel ordre en raison de dommages à la toile survenus récemment.

Impact sur le fonctionnement du Dôme 

  • Pour le moment, il est trop tôt pour déterminer la durée de cette fermeture. Nos équipes s’affairent présentement à évaluer l’étendue des réparations requises. Nous vous tiendrons informés de la suite des choses lorsque nous aurons plus d’informations à partager.

Nous sommes désolés des inconvénients et vous assurons que nous mettons tout en œuvre pour que la situation soit rétablie dans les plus brefs délais.

 

The Dome @ Louis Riel offers: a multidisciplinary sports field of 105 x 48 m with high-quality artificial grass that can be divided into three fields of 35 x 48 m; a 400 m track with a coating in « Mondo »; including six lanes 120m; and including designated areas for jumping, four locker rooms, and free parking for 270 cars.

Monthly calendar

Important Notice

Wednesday, March 26, 2025

We wish to inform you of an important decision regarding the Dome Louis-Riel of our school.

After a thorough evaluation of the damage caused by the snowstorm last February, we regret to announce that the Dome will not be reopened for the 2024-2025 school year.

That being said, the CEPEO has planned a complete replacement of the dome’s canvas this summer with a scheduled reopening in September 2025.

Cleaning work to prepare the site is currently underway. The shell change will be carried out as planned.

Thank you for your understanding and collaboration.

Sincerely,

 

Carole Séguin                                               Sophie Anderson
Director                                                          Dôme LR Manager

*************************************************************

 

The Dome @ Louis-Riel puts at your disposal

  • A multidisciplinary structure
  • Accessible to people with reduced mobility and wheelchairs;
  • A 105m x 48m indoor sports field made of high quality artificial turf that can be divided into three 35m x 48m grounds;
  • A multisport court for Basketball, Volleyball, Badminton, and Futsal
  • A « Mondo » track with four 400m lanes and six straight 120m lanes;
  • Mondo covered areas  for jumps;
  • A weight room
  • Four locker rooms with showers;
  • 270 free parking spaces.

Who is the Dome @ Louis Riel for?

For those who want to practice a variety of summer sports and this year round, rain or shine:

  • Badminton
  • Football
  • Rugby
  • Ultimate Frisbee
  • Baseball
  • Lacrosse
  • Volleyball
  • Fitness
  • Soccer
  • Track and Field: Walk/Run/Jump

Current fields availability (Click here)

Fields

Our fields can be used outside of school hours.

Click here to view fields availability

 

Track / runners

Important Notice

Wednesday, March 26, 2025

We wish to inform you of an important decision regarding the Dome Louis-Riel of our school.

After a thorough evaluation of the damage caused by the snowstorm last February, we regret to announce that the Dome will not be reopened for the 2024-2025 school year.

That being said, the CEPEO has planned a complete replacement of the dome’s canvas this summer with a scheduled reopening in September 2025.

Cleaning work to prepare the site is currently underway. The shell change will be carried out as planned.

Thank you for your understanding and collaboration.

Sincerely,

 

Carole Séguin                                               Sophie Anderson
Director                                                          Dôme LR Manager

*************************************************************

 

Find all the information concerning the access to our track

Summer programs

Contact us

For all inquiries, please contact us at dome@cepeo.on.ca or by phone at 613-830-1993 ext. 221